Company Experience

PETI is a full-service cleanroom and laboratory construction company that is highly recognized for its technical expertise and service-minded professionals. PETI’s engineers, design team, project managers, field technicians, and commissioning & certification group are highly experienced top industry professionals who can take your next project from the initial design phase to a fully operational turnkey facility. That facility might be a small 500 square foot ISO 8 (Class 100,000) cleanroom environment or a brand new 100,000 square foot facility requiring everything from lunch & restrooms, office & conference rooms, shipping & receiving to multiple ISO certified (various classifications) cleanroom areas. Cleanroom cleanliness levels from ISO 4 – ISO 8 (Class 10 – Class 100,000) are offered, including compliance with cGMP and USP 797 requirements. Whatever your requirements, Pacific Environmental Technologies, Inc. has the in-house capabilities to take you there, including required design drawings, submission for plan check, pulling of building permits, and construction management.

The following is an overview of some of the cleanroom facilities we have had the pleasure to design and construct for a variety of client types.

AMPHASTAR PHARMACEUTICAL, INC.

INJECTABLE PHARMACEUTICAL CLEANROOM MANUFACTURING FACILITY

Cleanroom areas – ISO 5, 7 & 8 (Class 100, 10,000 & 100,000) 10,163 Sq./Ft.

Total Project Build-out 10,163 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM MANUFACTURING FACILITY
  2. Complete engineering design of architectural, structural, electrical, plumbing, fire protection, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, electrical, mechanical layouts, DI system, CDA/VAC system, process water, waste treatment, bulk gases, high purity gases, and HVAC equipment & chiller plant
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test & balance of mechanical systems, and certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, concrete, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

BROOKS AUTOMATION

IC FAB EQUIPMENT MANUFACTURING & TESTING FACILITY

Cleanroom areas – ISO 6 & 7 (Class 1,000 & 10,000) 10,163 Sq./Ft.

All other areas (non-cleanroom) 24,460 Sq./Ft.

Total Project Build-out 39,580 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM FACILITY, INCLUDING TENANT IMPROVEMENT AND ALL OTHER SUPPORT AREAS
  2. Complete engineering design of demolition, architectural, structural, electrical, plumbing, fire/life safety, process utilities, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, electrical, mechanical layouts, RO system, process utilities, HVAC equipment & chiller plant
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test & balance of mechanical systems, and certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, concrete, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

DIGILENS, INC.

IC PILOT PLANT FOR WAVEGUIDE TECHNOLOGY

Cleanroom areas – ISO 5 & 7 (Class 100 & 10,000) 4,738 Sq./Ft.

All other areas (non-cleanroom) 4,875 Sq./Ft.

Total Project Build-out 9,613 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE H6 LEVEL CLEANROOM FACILITY, INCLUDING TENANT IMPROVEMENTS
  2. Team approach for complete engineering design of demolition, architectural, structural, electrical, plumbing, fire protection, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, electrical, mechanical layouts, DI system, CDA/VAC system, process water, waste treatment, gas bunkers, bulk gases, high purity gas delivery, electric switch gear/substation, back-up generator and HVAC equipment & chiller plant
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, gas bunkers, concrete, structural and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed turn-over package

HEMACARE INC.

BLOOD ANTIBODY PROCESS FACILITY

Cleanroom areas – ISO 5, 7 & 8 (Class 100, 10,00 & 100,000) 9,560 Sq./Ft.

Total Project Build-out 9,560 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM FACILITY
  2. Complete engineering design of architectural, structural, electrical, plumbing, fire protection, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, electrical and mechanical layouts
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, gas bunkers, concrete, structural and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed turn-over package

INTERNATIONAL MEDICAL SYSTEMS

PHARMACEUTICAL MANUFACTURING FACILITY

Cleanroom areas – ISO 5, 6, 7 & 8 (Class 100, 1,000, 10,000 & 100,000) 7,892 Sq./Ft.

Total Project Build-out 7,892 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM MANUFACTURING FACILITY
  2. Complete engineering design of architectural, structural, electrical, plumbing, fire protection, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, electrical, mechanical layouts, High Purity process water, CDA/VAC system and HVAC equipment & chiller plant, boiler
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test & balance of mechanical systems, and certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, concrete, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

INDUSTRIAL CIRCUITS

ELECTRIC CIRCUIT BOARD MANUFACTURING FACILITY

Cleanroom areas – ISO 7 & 8 (Class 10,00 & 100,000) 9,400 Sq./Ft.

Total Project Build-out 9,400 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM FACILITY
  2. Complete engineering design of architectural, structural, electrical, plumbing, fire protection, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, and mechanical layouts
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including cleanroom walls, ceilings, flooring, HVAC & process mechanical, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

KYOCERA AMERICA, INC.

ELECTRONIC HYBRID MANUFACTURING FACILITY

Cleanroom areas – ISO 7 & 8 (Class 10,00 & 100,000) 10,000 Sq./Ft.

Total Project Build-out 10,000 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM FACILITY
  2. Complete engineering design of architectural, structural, electrical, plumbing, fire protection, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, and mechanical layouts
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including cleanroom walls, ceilings, flooring, HVAC & process mechanical, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

McCLELLAN AIR FORCE BASE

IC MANUFACTURING FACILITY (Weapons Systems Semiconductor Fab)

Cleanroom areas – ISO 4, 5 & 7 (Class 10, 100 & 1,000) 3,956 Sq./Ft.

Total Project Build-out 3,956 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE H6-LEVEL CLEANROOM FACILITY
  2. Complete engineering design of architectural, structural, electrical, plumbing, fire protection, process mechanical, gas detection, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, mechanical layouts, DI system, CDA/VAC system, process water, waste treatment, bulk gases, high purity gases, electric switch gear/substation, back-up generator and HVAC equipment/chiller plant
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, gas bunkers, concrete, structural and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

MOS ELECTRONICS TAIWAN INC.

SDRAM & SPECIAL MEMORY CHIP MANUFACTURING FACILITY

Cleanroom areas – ISO 3, 5, 6, 7 & 8 (Class 1, 100, 1,000, 10,000 & 1000,000) 57,000 Sq./Ft.

Total Project Build-out 57,000 Sq./Ft.

  1. SCOPE: PROVIDED PRELIMINARY DESIGN, DEVELOPMENT, ENGINEERING, AND COMPLETE BID SPECIFICATION PACKAGE
  2. CAD drawings – floor plan, site layout, mechanical layout, sections, and airflow schematics
  3. Engineering tables for recirculation air, make-up air, exhaust air, static pressure, KW/horsepower requirements, annual operating costs, heating/cooling loads, and ventilation loads
  4. Electrical load summary for HVAC, lighting, process, and support systems, office electrical and emergency power requirements
  5. Block space drawings for DI system, CDA/VAC system, process water, waste treatment, bulk gases, high purity gases, electric switch gear/substation, and HVAC equipment/chiller plant
  6. Preliminary construction budget and material/equipment recommended vendors
  7. Process equipment detailed requirement tables for exhaust air, electrical, process cooling water, DI water, ultra-pure gases, CDA/VAC, and other utility requirements
  8. Schematic CAD drawings for process piping, exhaust, electrical, and HVAC piping
  9. Recommendations for safety considerations per Uniform Building Code (UBC), National Fire Code (NFC), and Hazardous Materials Handling per (UBC H-6)

NELCO PRODUCTS

PRINTED CIRCUIT BOARD MANUFACTURING

Cleanroom areas – ISO 5, 7 & 8 (Class 100, 10,000 & 100,000) 10,163 Sq./Ft.

Total Project Build-out 10,163 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM FACILITY, INCLUDING SUPPORT AREAS
  2. Complete engineering design of architectural, structural, electrical, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, electrical, mechanical layouts, DI system, CDA/VAC system, process water, waste treatment, bulk gases, high purity gases, and HVAC equipment & chiller plant
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test & balance of mechanical systems, and certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, concrete, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

SEAGATE MAGNETICS (QUINTA)

DISK DRIVE MANUFACTURING FACILITY

Cleanroom areas – ISO 5 (Class 100) 4,200 Sq./Ft.

Total Project Build-out 4,200 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM FACILITY
  2. Complete engineering design of architectural, structural, electrical, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, and mechanical layouts
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including cleanroom walls, ceilings, flooring, HVAC & process mechanical, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

SEMCO LASER TECHNOLOGY

MOCVD FACILITY

Cleanroom areas – ISO 4, 5 & 6 (Class 10, 100 & 1,000) 3,956 Sq./Ft.

Total Project Build-out 3,956 Sq./Ft.

  1. SCOPE: PROVIDED DESIGN REVIEW, ENGINEERING, AND TURN-KEY CONSTRUCTION OF THE H6 LEVEL CLEANROOM FACILITY, INCLUDING TENANT IMPROVEMENTS. H6 LEVEL CONSTRUCTION
  2. Team approach for complete engineering design of demolition, architectural, structural, electrical, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, mechanical layouts, DI system, CDA/VAC system, process water, waste treatment, bulk gases, high purity gases, electric switch gear/substation, back-up generator and HVAC equipment/chiller plant
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including demolition, cleanroom walls, ceilings, flooring, plumbing, HVAC & process mechanical, gas bunkers, concrete, structural and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package

UNIT INSTRUMENTS

MASS FLOW METER MANUFACTURING FACILITY

Cleanroom areas – ISO 5, 7 & 8 (Class 100, 10,000 & 100,000) 12,560 Sq./Ft.

Total Project Build-out 12,560 Sq./Ft.

  1. SCOPE: PROVIDED COMPLETE DESIGN AND TURN-KEY CONSTRUCTION OF THE CLEANROOM FACILITY
  2. Complete engineering design of architectural, structural, electrical, process mechanical, HVAC mechanical, and all necessary support utilities
  3. CAD drawings – floor plan, site plan, sections, ceiling plan, and mechanical layouts
  4. Documents for and executed by the city permit process
  5. Project management to manage all phases of engineering, procurement, subcontractor qualifications, site management, start-up, test and balance of mechanical systems, and clean room certification
  6. Construction management to manage all phases of construction, including cleanroom walls, ceilings, flooring, HVAC & process mechanical, structural, and electrical
  7. Commissioning and cleanroom certification for compliance per Federal Standard 209E
  8. Detailed Turn-over package